Postingan Populer
Pendaftaran Perusahaan Indonesia
PP 20/2026’s IDR 500M tax-free turnover threshold affects onboarding, contracting, AP processing, and the evidence you need to support withholding decisions for individual MSME sellers and agents. This guide shows how to segment payees, build transaction-speed decision logic, track threshold usage, update invoice and contract terms, and run month-end controls ahead of 2027 readiness.
PER-10/BC/2026 can create inventory, close, and tax problems when customs-controlled goods (including barang tidak dikuasai) are not handled through a clear trigger-to-evidence workflow. This guide provides a role-based roadmap for Ops, Warehouse, Finance/Tax, and Company Secretary to standardise SOPs, document packs, decision gates, accounting entries, and record retention so cases remain audit-ready into 2027.
BI Rate 5,75% dapat menaikkan biaya dana SME lewat kombinasi bunga, fee, dan pola pemakaian fasilitas kredit yang kurang disiplin. Artikel ini memandu cara menghitung total cost of borrowing, membangun forecast kas 13-minggu, serta mendesain struktur rekening saat bank account opening agar likuiditas lebih terkontrol menuju 2027.
Integrasi OSS–SIAPkerja–All Indonesia membuat proses RPTKA hingga izin kerja dan KITAS sangat bergantung pada konsistensi data, urutan pengajuan, dan handover lintas tim. Panduan ini memetakan workflow end-to-end, RACI, master data yang wajib selaras, bottleneck yang paling sering terjadi, serta kontrol operasional untuk mengurangi rework dan keterlambatan onboarding TKA.
PSAK 120 can force regulated Indonesian SMEs to recognise regulatory assets and liabilities that were previously tracked informally, affecting profit timing, KPIs, and audit work. This guide lays out a practical approach to screen scope, redesign month-end close with an audit-ready evidence pack, and run a 2026 parallel process so 2027 reporting is repeatable.
SMEs often miss expat start dates because the OSS-integrated RPTKA→VITAS→ITAS/KITAS pathway exposes data mismatches, unclear job titles, and broken handoffs early. This guide shows how to plan backwards, build a single source-of-truth document pack, assign step ownership, and run a tracker so approvals move without avoidable rework.





